| Job Title |
Tile-conduit Layer |
| Job Description |
Lays Tile Conduit That Insulates And Protects Water Or
Steampipes: Lays Runners In Previously Excavated Trench And
Checks Slope With Carpenter's Level, Digging Out Or Filling In
With Loose Earth. Splits Drain Tile Longitudinally And Places
Halved Tiles On Runners, Fitting Spigot End Of Each Half Tile
Into Bell End Of Adjacent Tile. Mixes Mortar Of Cement, Oakum,
And Water, And Applies It To Edges Of Top Half Of Tiles After
Pipe Fitter (construction) Has Laid Water Or Steampipes In
Bottom Tiles Already In Position. Places Top Half Sections On
Corresponding Bottom Half Tiles And Seals Joints Between
Sections By Forcing Mortar Into Bell End Of Tiles [pipe Layer
(construction)].
|
|