| Job Title |
Rigger |
| Job Description |
Installs Blocks And Guy Lines For High Lead, Slack Line, Or
Similar Log Yarding System: Cuts Notch Around Anchor Stumps
Specified By Hook Tender (logging), Using Chain Saw And Ax.
Wraps Cable Around Stump And Secures It In Position With Spikes
And U-bolts. Installs Block, Pulls Winch Cable Through Block,
And Secures Cable To Yarding Blocks And Guy Lines. Signals Winch
Operator To Haul Yarding Blocks And Guy Lines To Anchor Stumps,
And Secures Them To Anchor Stumps. Splices Cable To Make Rigging
Parts Or Repair Broken Or Worn Cable, Using Marlin Spikes, Vise,
Hammer, And Wire Cutters. Dismantles Yarding System And Loads
Rigging Onto Trucks For Removal To New Yarding Site. May Install
Yarding Cables, Choker Cables, Cable Swivels, Carriages, And
Related Rigging. May Rig And Erect Wooden Spars. May Climb
Wooden Spars, Using Climbing Spurs And Safety Rope, To Install
Or Repair Rigging. May Lead Activities Of Crew And Be Designated
Head Rigger (logging).
|
|