| Job Title |
Cell Installer |
| Job Description |
Removes Defective Mercury Electrolytic Cells From Rocker
Mechanism And Installs New Cells, Using Handtools: Removes Bolts
And Rocker Assembly That Hold Cell Bottom In Place On Rocker
Mechanism, Using Wrenches. Signals Overhead Crane Operator (any
Industry) 921.663-010 To Remove Defective Cell And Position
Replacement Cell On Rocker Mechanism. Visually Levels Cell On
Mechanism And Bolts It Into Place. Cements Glass Sight Tubes In
Sides Of Concrete Bottom And Bolts Copper Hanger Beneath Cell
Bottom. May Raise Or Lower Cell Bottom, Using Leveling Jacks,
And Time Rate Of Flow Of Mercury, Using Stopwatch, To Ensure
That Cell Is Mounted In Accordance With Efficient Operating
Requirements.
|
|